top of page

What an ADU costs in Altadena (2026)

Altadena is not a city. It is unincorporated LA County, so the County runs permits. Here are typical numbers, the local rules, and your next step.

Typical ADU numbers in Altadena

  • A 750 sq ft backyard ADU with a standard finish costs about $300,000 to build, all in: building, site work, city fees and design.
  • Typical ADU rent: about $4,300 a month for 750 sq ft.
  • Home value nearby: about $850 per sq ft (Close-in area).

Run the free ADU and new home cost calculator for Altadena

ADU permits and local rules in Altadena

Who runs permits

LA County Public Works (building permits, on EPIC-LA) and Regional Planning (zoning).

Fire rebuild help

For Eaton Fire rebuilds, the County offers pre-approved plans, a self-certification option, and fee deferrals or refunds for homes the owner lived in. There's a One-Stop Permit Center in Altadena.

What can slow you down

  • Much of Altadena is in a high fire zone. New homes there need fire-resistant building.
  • New state rules will ban burnable things within 5 ft of homes (Zone 0).
  • SB 9 lot splits are paused in the burn area for now.

Sources: recovery.lacounty.gov (fee deferrals, self-certification); LA County Public Works. State ADU law. General information, not legal advice. Updated October 2026.

Free lot check in Altadena

Send Hemisphere A&E your address. We look up your zoning and lot size, what fits (ADU, junior ADU, SB 9, new home, apartments, remodel or business space), red flags like fire zones or hillside rules, and a rough cost range. No cost, no pressure. Email info@hemisphereae.com or call (619) 762-7144.

More cost guides for Altadena

Cost guides for more of LA County

© 2024 Hemisphere A&E . All rights reserved.

bottom of page